| Sl No | Name of the Bridge | Connectivity | Length of the Bridge | Width of the Bridge | Project Cost in Crores | Expenditure incurred | Completed & Inaugurated |
| 1 | Parallel Bridge to Nayapul over River Musi | Afzalgunj to Charminar | 202.10 Mts | 12.00 Mts | 1.90 | 2.31 | February 1999 |
| 2 | Bridge across Musi River at Bapughat. | to Hyderguda | 307.50 Mts | 7.50 Mts | 6.33 | 6.33 | 05-12-2012 |
| 3 | Road over Bridge at Kukatpally on Spinal Road over the Railway line | Spinal road connecting Kukatpally to Hitec city & New Mumbai Highway road NH-9 to Old Bombay road | 910.00 Mts | 21.5 Mts with four lane divided carriage way | 68.68 | 0 | 18-05-2013 |