<%@ Page Title="" Language="C#" MasterPageFile="~/Site.Master" AutoEventWireup="true" CodeBehind="Developdept4.aspx.cs" Inherits="HMDAWebsiteUpdate2.Developdept4" %>

DEVELOPMENT DEPARTMENT

  1. MAJOR PROJECTS OF HMDA
  1. BRIDGES:
Sl No Name of the Bridge Connectivity Length of the Bridge Width of the Bridge Project Cost in Crores Expenditure incurred Completed & Inaugurated
1 Parallel Bridge to Nayapul over River Musi Afzalgunj to Charminar 202.10 Mts 12.00 Mts 1.90 2.31 February 1999
2 Bridge across Musi River at Bapughat. to Hyderguda 307.50 Mts 7.50 Mts 6.33 6.33 05-12-2012
3 Road over Bridge at Kukatpally on Spinal Road over the Railway line Spinal road connecting Kukatpally to Hitec city & New Mumbai Highway road NH-9 to Old Bombay road 910.00 Mts 21.5 Mts with four lane divided carriage way 68.68 0 18-05-2013